ariktools

Choose Around the Material and Intended Layer

Identify the product being applied, its substrate and the layer you need. An underlayment beneath a floor covering and a finished resin layer can use similar-looking tools with different instructions. Check the permitted application thickness and finishing method before building the list. Self leveling describes the material; it does not remove the need for controlled preparation, mixing, placement and the required finishing operation.

Selection pointWhat to check
UnderlaymentIdentify the layer beneath the floor covering.
Resin finishIdentify the specified finished resin layer.
Specified layerRecord the system's thickness and purpose.
Material procedureFollow the named material's application steps.

Separate Measuring, Mixing and Carrying

Self Leveling Mixing Tools are containers. Review the container’s confirmed capacity, condition and handling for the selected mixture, then specify the measuring and powered mixing equipment separately. ARDEX’s Tool Kit identifies a barrel, measuring buckets and a paddle as different items. Keep liquid measurement, mixing and carrying in the preparation plan so a container order is not mistaken for a complete mixing station.

Choose the Spreading Head and Working Edge

Compare Wood Handle Squeegee, Plastic Handle Squeegee et Hand Spreading Tool by the actual head, blade attachment and access needed for the layer. Check the blade face specified for the material and review local edges separately from open runs. Handle material alone does not establish film thickness or chemical suitability. Record the head and blade together when requesting tools or replacements.

Selection pointWhat to check
Working headIdentify the actual spreading head.
Blade attachmentCheck the blade and holder together.
Open areaReview the tool's open-area role.
Local edgeCheck the approach to local edges.

Add Rollers and Shoes When the Procedure Calls for Them

Review Spiked Rollers for the finishing method and working window of the named material. Review Chaussures à pointes only for an access method permitted by that procedure. ARDEX TL 2000 describes spreading followed by smoothing or spike rolling within a continuous application. Check the tool’s confirmed spike arrangement against the layer rather than assuming every pour requires rolling or every shoe can enter every wet system.

Professional Spiked Rollers

Chaussures à pointes

Keep Placement and Finishing in One Material Plan

Plan how measured batches reach the prepared area, how the material is spread and which finishing action follows. Keep the product’s working window beside that sequence. Review a representative sample for the intended layer and any tool marks after the required operation. Record the material, blade and conditional roller used so changes in the tool list can be assessed against the same application.

Send a Material-Specific Tool List

Send the material manufacturer and product, substrate, intended layer and work area. Include your container, spreading tool and blade selections, plus rollers or shoes where required. For an existing head, attach mounting photographs for Squeegee Blades. Add quantities and destination. If you want to evaluate an existing product or discuss branding, include that interest with the same list so its available conditions can be reviewed.

Questions fréquemment posées

Use the material's application procedure to identify measuring, mixing, spreading and finishing operations. Confirm the working head for each required action and the material's timing. The material description alone does not show which tools are required to place and finish its intended layer.

Check the named material's finishing and access method. Identify whether rolling is required or permitted, its working window and the suitable spike arrangement. Review shoes only for the specified access task; include both as conditional items where the procedure supports them.

Self Leveling Mixing Tools is the container family in this range. Confirm its actual capacity and supplied items, then identify any powered mixer, paddle and liquid-measuring equipment separately. Keep these items distinct in the preparation plan and quotation.

Send the product names or models, configurations, quantities and delivery destination. You can include mixing buckets, spreaders, spiked rollers and shoes in the same enquiry. The applicable quantity tier, packing details and order conditions will be reviewed for the selected items.

Send your logo artwork, preferred placement, packaging requirements and estimated order quantity. ARIK will review the available options for the selected tools and confirm the sample requirements, order conditions and quotation before production.

Include the models and configurations you want to evaluate, the intended application and the delivery destination in your enquiry. Sample availability, cost and shipping arrangements need to be confirmed for the selected items before an order is placed.

Obtenez votre devis maintenant

  • Contactez-nous pour un devis personnalisé.
  • Économisez davantage grâce à nos prix directs !
  • Prix de gros compétitifs.
  • Pas d'intermédiaire, de meilleures offres.

Obtenir un devis personnalisé